Search
Close this search box.

Student Athlete Performance Center Project Update

culleneditor

The first phase of the Student Athlete Performance Center is well underway.

This phase provides a tunnel access from the lower level of the McClain Center to the playing field to allow football players and coaches direct access to the field from the locker room suite. It will also prepare internal Camp Randall Stadium spaces so the McClain Center’s lower level can be vacated and remodeled. The renovations will be to the first and second levels of Camp Randall. This will include department staff relocations.

Phase one will also include turf replacement in Camp Randall Stadium. The timeline is Jan. 2012 to June 2012.

Cullen icon

Related Posts