Author: George Cullen



Prefabricating 75,000 lbs. Tanks

By | February 04, 2019

Prefabrication is a schedule saver that reduces congestion and promotes safer work at jobsites. On a current jobsite, prefabrication was used on a grand scale. The specifications for this prefabrication job included four tanks and five alcove walkways for our food client. With limited space and large items, the JP Cull...
Read More