JP Cullen has been completing work for Alliant Energy (formerly Wisconsin Power & Light) since 1973 with our first project at their Sheboygan, WI facility. Over the year we have completed several projects at their locations around the Midwest including:

  • Columbia Energy Center
    • Original Construction of Power Plant
    • Site Services
    • Coal Chute Transfer Tower Reconstruction
  • Edgewater
    • Original Construction of Power Plant
    • Miscellaneous On-Site Projects
  • Kilbourn Dam
    • Spillway and Toe Reconstruction – Concrete work on the spillway aprons and toe dam concrete
    • Retaining Wall & Pad – Installation of two concrete masses adjacent to spillway apron wall.
  • Prairie du Sac Dam
    • Reconstruction of 42 Spillways and Apron – Concrete Repairs on the spillways by removing and replacing damaged and deteriorated concrete and exposed steel rebar. Repair of the Upper and Lower concrete aprons. The water in the dam had to be controlled before any concrete could be poured.
    • Switch Gear Room

We continue to complete work with them at their facilities.