Prefabrication

At the core of our process improvement and prefabrication methods is a focus on adaptability, a culture of continuous learning, and a commitment to implementing only value-adding steps for our clients.

Cullen icon

Prebuilding Walls and Materials

We have proven prefabrication saves time, reduces costs, creates safer work environments, improves quality, and enhances the revenue stream of project owners. Our projects that utilize prefabrication are experiencing up to 10% savings in cost, 25% savings in schedule, 16% decrease in fall hazard exposure cases, and a 90% reduction in waste.

Enhances Revenue Stream for You

The quicker you have use of your building, the quicker you can start generating revenue.

Creates Safer Work Environments

More work happening at ground level reduces fall hazard exposure. It also allows for a more organized, clean, and safer work environment.

Yields Project Savings

Fewer errors and greater efficiencies translate to cost savings for you. When combined with BIM, change orders are significantly reduced.

Increases Sustainability & Raises ROI

Prefabrication & BIM provides precise measurements, preventing material waste and allowing unused materials to be recycled. Less waste translates into a higher ROI for you.

Our Projects

Vice President of Field Operations
Scott Borroughs

In-House Experts

Our in-house experts, led by Scott Borroughs, have a keen understanding of the importance of a well-designed plan for both engaging and educating stakeholders throughout the entire life of the project – from the day we are hired and beyond the completion of construction. We will ensure you have a strategic plan and assist you in the planning and execution of  prefabrication project.

Contact Us | Services

"*" indicates required fields

Name*
Hidden
Drop files here or
Max. file size: 50 MB.
    This field is for validation purposes and should be left unchanged.
    Franklin Forest Park Middle School

    Prefabrication Case Study

    30+

    prefabricated exterior panels set daily

    $2.9M

    under referendum budget at completion

    3

    weeks to enclose entire building

    1

    month ahead of construction schedule

    At Franklin Forest Park Middle School, all exterior, 10’ x 30’+, wall panels were prefabricated to accelerate the schedule. The team set over 30 panels a day, allowing the building to be water-tight sooner and for interior work to begin ahead of schedule. The panels were produced at our off-site prefabrication shop and trucked to site. Producing the panels off-site increased worker safety and allowed faster production. By prefabbing, it saved 1 month on schedule allowing the building to be enclosed in three short weeks.